comparemela.com

Latest Breaking News On - சைக்கிள் ஓட்டுதல் வக்கீல்கள் - Page 1 : comparemela.com

Construction resumes on West Link pathway

Article content Construction crews are at work on the Main Street-Memorial Drive-Murray Street-Oak Street intersection. Memorial Drive at Main Street West will be closed for up to five days starting Wednesday at 7 a.m. We apologize, but this video has failed to load. Try refreshing your browser. The street is slated to be closed Wednesday to Friday, then reopen during the weekend. It will be closed again Monday and Tuesday. Flag people were directing traffic Tuesday on Memorial Drive as heavy equipment tore up the ground alongside the roadway, traffic reduced to one lane between the Ottawa Valley Rail line and Main Street West.

Construction to resume on West Link pathway

Article content Construction is set to resume Monday on the Main Street-Memorial Drive-Murray Street-Oak Street intersection. The intersection is being rebuilt as part of the construction of the West Link multi-use pathway, which began last year. The project is tentatively scheduled for completion by July. We apologize, but this video has failed to load. Try refreshing your browser. Construction to resume on West Link pathway Back to video The work will include the reconfiguration of lanes, the addition of a left-turn lane on Murray Street and line painting for bikes. The project also includes the extension of the three-metre wide asphalt multi-use pathway on Memorial Drive to the intersection, where it will connect to the designated bike lanes on Main Street West

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.