Notes:
Insufficient drilling has been completed to accurately determine the Gosselin Zone orientation. Actual core widths are estimated at approximately 60 to 95% of the core interval.
Drill hole intercepts are calculated with a lower cut of 0.30 g/t Au.
Assays are reported uncut but high grade sub-intervals are highlighted.
GOS20-52 Core Interval 78.65 to 109.00 m has actual core widths estimated to be 26.6% of the core interval. BTW drill core. Core diameter is 42.0 mm
Technical Information and Quality Control Notes
The drilling results contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects.