MIL-OSI New Zealand: Education – Local Engineers Doing Their Bit To Fight Tradie Shortage foreignaffairs.co.nz - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from foreignaffairs.co.nz Daily Mail and Mail on Sunday newspapers.
Nuberg EPC Wins 500 TPD Sulfuric Acid Plant Project in Egypt
Egypt: Engineering Nuberg EPC Wins 500 TPD Sulfuric Acid Plant Project in Egypt
22.01.2021Editor: Ahlam Rais
Sprea Misr has awarded Nuberg EPC with the mega project on Engineering, Procurement and Construction, & Lump Sum Turnkey basis in Egypt. The project will be based on the Double Contact Double Absorption process technology. Related Companies (Source: Nuberg EPC)
New Delhi/India – Nuberg EPC has been awarded a 500 TPD Sulfuric Acid Plant project on Engineering, Procurement and Construction (EPC) & Lump Sum Turnkey (LSTK) basis in Egypt. The project, which was awarded during the pandemic, is owned by Sprea Misr, a leading chemicals and plastics manufacturer in Ramadan City, Egypt. Nuberg EPC will be the single-point solution company responsible from concept to commissioning of the project. It is also the g
Nuberg EPC wins sulfuric acid plant project
1/21/2021
A global EPC and turnkey project management company, Nuberg EPC has been awarded the prestigious 500 TPD Sulfuric Acid Plant project on EPC & LSTK basis in Egypt. The project, which was awarded during the pandemic, is owned by Sprea Misr, a leading chemicals and plastics manufacturer in Ramadan City, Egypt. Nuberg EPC will be the single-point solution company responsible from concept to commissioning of the project. It is also the globally recognized Sulfuric Acid technology supplier.
The 500 TPD Sulfuric Acid Plant project will be based on the latest Double Contact Double Absorption (DCDA) process technology. The Double contact process is used for the production of sulfuric acid in high concentrations which is required for industrial purposes. The project also incorporates a 5MW turbine with a steam-based power generation plant with a complete bypass arrangement. This is the first time that Nuberg EPC is building a turbine uni