Technology group Wärtsilä will operate power modules on an FPSO vessel in the Papa Terra oilfield, Brazil, and sign a five-year Optimised Maintenance Agreement with 3R Petroleum to ensure reliability and performance. Learn more.
The technology group Wärtsilä has signed Optimised Maintenance Agreements covering two LNG carrier vessels technically managed and operated by the Japanese shipping group MMS Co.,. | April 13, 2022
The technology group Wärtsilä has signed Optimised Maintenance Agreements (OMAs) covering two LNG carrier vessels technically managed and operated by the Japanese shipping group MMS Co., Ltd. The agreements, signed in February 2022, are designed to deliver maximised engine uptime and long-term cost predictability, optimising maintenance for highest efficiency and lowest carbon footprint. Central to .