Live Breaking News & Updates on பாரின் ருவா பல்நோக்கு அணை

Stay updated with breaking news from பாரின் ருவா பல்நோக்கு அணை. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Boost for Nasarawa Hydropower Project


President Muhammadu Buhari has taken over completion of the 20 Megawatts Farin Ruwa Hydropower project initiated by the Nasarawa State government within 24 months, reports Igbawase Ukumba
Available statistics from the consulting firm for the Farin Ruwa Multipurpose Dam project – Kwarra in Wamba Local Government Area of Nasarawa State, Poseidon Tech Limited, showed that the Farin Ruwa Hydropower project has a dam with an earthfill embarkment with a cress length of 745 metres and a height of about 65 metres. The dam also has a reservoir capacity of 73 million cubic litres, with an area capacity of about 5.3 kilometres sqare.
Nevertheless, the statistics revealed further that the Farin Ruwa Dam’s risen water level storage to fill up to the annual average flow will be about 420 metres. Other parts of the dam include a spillway, a power house, dam protection; both up stream and down stream, access road through the dam up to Manga settlement. A saddle dam of about 500 metres ....

Abuja Federal Capital Territory , Federal Capital Territory , Nigeria General , Igbawase Ukumba , Muhammadu Buhari , Suleiman Adamu , Musa Ibrahim Weng , Musa Weng , Umaru Tanko Al Makura , Aliyu Akwe Doma , Abdullahi Adamu , Poseidon Tech , Nasarawa Energy Company , Nasarawa Electricity Power Agency , National Assembly , Ministry Of Water Resources , Messrs Wiz China Worldwide Engineering , President Muhammadu Buhari , Farin Ruwa Hydropower , Nasarawa State , Farin Ruwa Multipurpose Dam , Wamba Local Government Area , Poseidon Tech Limited , Farin Ruwa Dam , Senator Abdullahi , Governor Aliyu Akwe Doma ,