comparemela.com

Latest Breaking News On - வீரம் வளங்கள் - Page 8 : comparemela.com

Investegate |Skyharbour Resources Ltd Announcements | Skyharbour Resources Ltd: Skyharbour s Partner Company Azincourt Energy Provides Update on 2021 Winter Drill Program at The East Preston Uranium Project

) (the “Company”) partner company Azincourt Energy Corp. (“Azincourt”) is pleased to provide an update on preparations for the 2021 winter exploration program at the East Preston uranium project, located in the western Athabasca Basin, Saskatchewan, Canada. Project Location – Western Athabasca Basin, Saskatchewan, Canada: Road preparation and placement of bridges to allow access to the primary drill sites at the Company’s East Preston property is underway. The 2021 exploration program is anticipated to cost approximately $1M to 1.4M and consist of a 10 - 12 hole, 2000-to-2500 meter diamond drill program. Drilling is anticipated to commence the third week of February. Based on the compilation of results from the 2019 and 2020 drill programs, 2018 through 2020 ground-based EM and gravity surveys, and property wide VTEM and magnetic surveys, the conductive corridor from the A-Zone through to the G-Zone (Figures 1 and 2) has been identified as the focus for the 2021 drilli

Investegate |Skyharbour Resources Ltd Announcements | Skyharbour Resources Ltd: Skyharbour s Partner Company Azincourt Energy 2021 Winter Drill Program Preparations Underway at East Preston Uranium Project

) (the “Company”) partner company Azincourt Energy Corp. (“Azincourt”) is pleased to provide an update on preparations for the 2021 winter exploration program at the East Preston uranium project, located in the western Athabasca Basin, Saskatchewan, Canada. Results from the 2020 HLEM survey have been received and drill target prioritization is now underway, based on the compilation of results from the 2019 and 2020 drill programs and 2018 through 2020 ground-based EM and gravity surveys, and property wide VTEM and magnetic surveys. An exploration program of a minimum of $1M will focus on the central portion of the East Preston property. Permits are in place to allow the commencement of an approximately 2,000-2,500 metre drill program consisting of up to 10 to 12 holes testing targets extending south from the A Zone into the G1, G2 and G3 target areas. Drilling in the A zone suggests this structural corridor hosts significant graphitic packages within strongly sheared and fa

Skyharbour Resources Ltd: Skyharbour s Partner Company Azincourt Energy 2021 Winter Drill Program Preparations Underway at East Preston Uranium Project

VANCOUVER, British Columbia, Jan. 21, 2021 (GLOBE NEWSWIRE) Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF)) (the "Company") partner company Azincourt Energy Corp. ("Azincourt") is

Skyharbour s Partner Company Azincourt Energy Completes Geophysical Program and Adds Drill Targets at East Preston Uranium Project - Energy Industry Today

Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) partner company Azincourt Energy Corp. (“Azincourt”) is pleased to announce

Skyharbour Expands Maverick East Zone with Additional High Grade Uranium Discovered in the

Press release content from Globe Newswire. The AP news staff was not involved in its creation. Skyharbour Expands Maverick East Zone with Additional High Grade Uranium Discovered in the . Skyharbour Resources LtdJanuary 7, 2021 GMT VANCOUVER, British Columbia, Jan. 07, 2021 (GLOBE NEWSWIRE) Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF) (Frankfurt: SC1P ) (the “Company”) is pleased to announce the remaining results from its 2020 fall diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake/McArthur River operations in the Athabasca Basin, Saskatchewan. In addition to the previously announced hole ML20-09 which returned 0.72% U3O8 over 17.5 metres from 271.5 metres to 289.0 metres, drillhole ML20-12 returned another broad zone of sandstone and basement-hosted uranium mineralization from 268.1 metres t

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.