comparemela.com

மைக் கோபி News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Michigan introduces energy security plan in expectation of Line 5 closure

Michigan introduces energy security plan in expectation of Line 5 closure
clickondetroit.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from clickondetroit.com Daily Mail and Mail on Sunday newspapers.

Enbridge rejects Michigan s demand to shut down oil pipeline - News - Holland Sentinel

TRAVERSE CITY — Enbridge said Tuesday it would defy Michigan s demand to shut down an oil pipeline that runs through a channel linking two of the Great Lakes, contending that Gov. Gretchen Whitmer s decision was based on bad information and political posturing.The Democratic governor in November moved to revoke a 1953 state easement that allowed part of the Canadian company s Line 5 to be placed along the bottom of the Straits of Mackinac. Saying Enbridge had repeatedly violated the terms

Enbridge says it won t shut pipeline | News, Sports, Jobs

AP Environmental Write PIPELINE USED TO carry crude oil is shown at the Superior terminal of Enbridge Energy in Superior, Wis., in 2018. Legal and political challenges and lower demand for oil during the pandemic have put the pipeline industry s future in doubt after a decade-long expansion. (AP Photo/Jim Mone, File) TRAVERSE CITY, Mich. (AP) Enbridge said Tuesday it would defy Michigan’s demand to shut down an oil pipeline that runs through a channel linking two of the Great Lakes, contending that Gov. Gretchen Whitmer’s decision was based on bad information and political posturing. The Democratic governor in November moved to revoke a 1953 state easement that allowed part of the Canadian company’s Line 5 to be placed along the bottom of the Straits of Mackinac. Saying Enbridge had repeatedly violated the terms and put the lakes at risk, Whitmer gave the company 180 days until May 12 to turn off the flow.

Enbridge rejects demands to shut down pipeline | News, Sports, Jobs

Jan 13, 2021 TRAVERSE CITY Enbridge said Tuesday it would defy Michigan’s demand to shut down an oil pipeline that runs through a channel linking two of the Great Lakes, contending that Gov. Gretchen Whitmer’s decision was based on bad information and political posturing. The Democratic governor in November moved to revoke a 1953 state easement that allowed part of the Canadian company’s Line 5 to be placed along the bottom of the Straits of Mackinac. Saying Enbridge had repeatedly violated the terms and put the lakes at risk, Whitmer gave the company 180 days until May 12 to turn off the flow.

Enbridge rejects Michigan s demand to shut down oil pipeline | News, Sports, Jobs

Jan 13, 2021 TRAVERSE CITY, Mich. (AP) Enbridge said Tuesday it would defy Michigan’s demand to shut down an oil pipeline that runs through a channel linking two of the Great Lakes, contending that Gov. Gretchen Whitmer’s decision was based on bad information and political posturing. The Democratic governor in November moved to revoke a 1953 state easement that allowed part of the Canadian company’s Line 5 to be placed along the bottom of the Straits of Mackinac. Saying Enbridge had repeatedly violated the terms and put the lakes at risk, Whitmer gave the company 180 days until May 12 to turn off the flow.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.