Weekly Road Construction Report
Here is the weekly road construction report for District 29:
BRADLEY COUNTY TDOT Maintenance on I-75 both directions from MM 15.4 to MM 20: On Monday thru Wednesday of this reporting period from 9 PM-6 AM, there will be intermittent lane closures on I75 Northbound and Southbound from MM 15.4 to MM 20.
BRADLEY COUNTY Utility Work on SR-74 (OCOEE ST. N.E.) both directions from LM 16.26 to LM 16.88: Shoulder and single lane closure between Westview Drive NW and Keith Street NW. Signage and cones will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM with an estimated completion 01/31/21.
Roadway Activity Report for TDOT Region 2 (December 10 - 16, 2020)
Thursday, December 10, 2020 |
DISTRICT 27
CLAY COUNTY SR-53 Bridge repair over Dry Fork Creek (LM 1.3) and Mill Creek (LM 2.5): The contractor will be on site continuing bridge repair work at Mill Creek Bridge located at LM 2.50. The contractor is also scheduled to have a lane closure on Dry Fork Bridge located at LM 1.35 in place. The southbound lane of SR 53 will be closed first during Phase 1 on both bridges; the northbound lane will be closed during Phase 2 on both bridges. Lane closures will be in effect until the contract completion on 06/30/21. Motorists are encouraged to use caution through the work zone and obey posted speed limit.