comparemela.com

Latest Breaking News On - Upper changi - Page 5 : comparemela.com

Roads along Pasir Ris Drive to Changi Village to be closed till 2029

Headed to Changi Village for some late night supper? Or work at Loyang Industrial District? You'll want to watch out for expected congestion and a possible change to your usual driving route, as a section of Loyang Avenue is now closed to facilitate construction work for the Cross Island Line Loyang Station and Loyang Viaduct. The affected section of road.

Changi
Singapore-general
Singapore
Tampines
Changi-village
Loyang-industrial
Loyang-avenue
Cross-island-line-loyang-station
Pasir-ris-drive
Cross-island-line-pasir-ris
Tampines-expressway

Not Just the Airport: Changi is Also First in Many Things We Do Not Know Of

In many ways, Changi will still be first even without the world-renowned airport. Here is what people don't normally know.

China
Germany
Shanghai
United-kingdom
Hong-kong
Singapore
Chinese
German
British
Zachary-tang
Robin-yeung
Francis-bernard-william-farquhar

Long-delayed Changi viaduct to open on Feb 19

SINGAPORE (The Straits Times/Asia News Network): A viaduct in Changi that was initially delayed by a fatal and costly construction accident will finally open on Feb 19.

Tampines
Singapore-general
Singapore
Tuas
Changi
Straits-times-asia-news-network
Land-transport-authority
Asia-news-network
Tampines-viaduct
Tampines-expressway
Pan-island-expressway

Retiree, 77, turns heads with community artwork using 80,000 bottle caps in Bedok

Singapore News - Crouching down on his knees, a man in a batik shirt gingerly hammered another bottle cap into the cement, working on a mosaic artwork in the middle of an open neighbourhood square in Bedok. The artist, retiree Sim Boh Huat, said he empties his mind and simply lets intuition. Read more at www.tnp.sg

Bedok
Singapore-general
Singapore
Sheryl-yeo
Heng-swee-keat
Bedok-bougainvillea-resident-committee
Sim-boh-huat
Upper-changi-road
East-coast
East-coast-plan
Deputy-prime-minister-heng-swee-keat

Flood outside Tanah Merah MRT station due to construction works leaves commuters stranded

Water from a nearby construction site caused flooding at the entrance of Tanah Merah MRT station during the downpour on Saturday (Nov 12) afternoon, rail operator SMRT said. Videos circulating on social media showed commuters wading through ankle-high water at the entrance of the station in New Upper Changi Road. "On Nov 12 at around 3pm, water from a construction.

Singapore
Lorong-gambir
Bedok-canal
Sheau-kai
Tanah-merah
New-upper-changi
Lam-sheau
Jalan-boon-lay
Upper-changi

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.