Al Tayer: The project entails the construction of three bridges and a tunnel spanning a combined length of 2,500 metres• The bridge and the surface junction are expected to be completed by July• The bridges and tunnels have a capacity of 28,800 vehi
Dubai s Roads and Transport Authority has announced the opening of two new bridges and a tunnel as part of its Falcon Interchange Improvement Project. A key segment of Al Shindagha Corridor, it will boast a total capacity of 27,200 vehicles per hour.
The two bridges are connected by the Infinity Bridge and Al Shindagha Tunnel from the Northern side and will eventually link up with the bridges that RTA is currently constructing at the junction of Sheikh Rashid Road and Sheikh Khalifa bin Zayed Street