Home / Shipping News / Port News / Valenciaport to put out to tender the construction and operation the terminal at Muelle Centro 2 in the Port of Sagunto
Valenciaport to put out to tender the construction and operation the terminal at Muelle Centro 2 in the Port of Sagunto
The Board of Directors of the Port Authority of Valencia (PAV) plans to study this Friday the tender specifications for the construction and operation of the multi-purpose terminal at Muelle Centro 2 in the Port of Sagunto, an infrastructure that will strengthen the site’s position as a benchmark industrial port in the Western Mediterranean. The multi-purpose maritime terminal will have a quay with a maximum length of 509 metres, with an adjoining area of approximately 226,000 m2, including some 15,000 m2 of manoeuvring area 30 metres wide next to the quay edge, and a minimum depth of 16 metres.