Welcome back to the board of appeals and we are on item number 7, appeal 13141. And this is patricia. Calderahead verses the department of building of inspection. 30323034 jackson street. Protesting the issuance on october 18, 2013, to nancy wong, alteration permit response to nov no. 201317501; shoring plan and sequence of excavation up to 20 at perimeter walls; revision to bpa no. 2007 07 12 6583; reference to bpa nos. 2009 09 24 7633, 2011 09 21 5155 and 2007 07 12 6583 and we can start with the appellant. Or the appellants agent. Good evening, im mike bowling, construction on behalf of patricia calderahead. In my brief i do not want to be redundant and so i have outlined what we would like to say but i would like to respond to their brief, which we received after of course, we filed our brief, page one of their brief states, they were on page one, they are appealing a permit based on financial reasons, not areasons pertaining to the Building Code this is a civil matter, and it is n

Transcripts For SFGTV 20140104

Concrete and that could have saved something but maybe the engineer kaos speak more to that. In your opinion, can you or not opinion, but could you describe how much work has been done at 3032 . They have done quite a bit of work and the shoring but with that permit it did not give the details that the Building Department would have wanted and even though we had the building inspect their was out there a couple of times and they had, they were only probably starting to do the shoring, because it might have been a couple for it and it was not a lot and there was some demolition done in the upper part of the building, but they have a long way to go, and they did have a long way to go and they do have a long way to go, and there are stages. The excavation, is it only on one side . Or is it across the lot . It is across the lot. Yes. But it is not, all the way back, is it . And you indicated that it has not been completed. No. And there are some, shoring right at the back Property Line and

Transcripts For SFGTV 20131228

Number 7, appeal 13141. And this is patricia. Calderahead verses the department of building of inspection. 30323034 jackson street. Protesting the issuance on october 18, 2013, to nancy wong, alteration permit response to nov no. 201317501; shoring plan and sequence of excavation up to 20 at perimeter walls; revision to bpa no. 2007 07 12 6583; reference to bpa nos. 2009 09 24 7633, 2011 09 21 5155 and 2007 07 12 6583 and we can start with the appellant. Or the appellants agent. Good evening, im mike bowling, construction on behalf of patricia calderahead. In my brief i do not want to be redundant and so i have outlined what we would like to say but i would like to respond to their brief, which we received after of course, we filed our brief, page one of their brief states, they were on page one, they are appealing a permit based on financial reasons, not areasons pertaining to the Building Code this is a civil matter, and it is not related to the validity of the permit, however that c

Transcripts For SFGTV 20131231

Yes. Hwang. Aye. Hurtado. Aye. Lazarus. Aye. Honda. Thank you. The vote is 50 and the permit is upheld on that basis. We are going to take a short break, five minutes. Welcome back to the board of appeals and we are on item number 7, appeal 13141. And this is patricia. Calderahead verses the department of building of inspection. 30323034 jackson street. Protesting the issuance on october 18, 2013, to nancy wong, alteration permit response to nov no. 201317501; shoring plan and sequence of excavation up to 20 at perimeter walls; revision to bpa no. 2007 07 12 6583; reference to bpa nos. 2009 09 24 7633, 2011 09 21 5155 and 2007 07 12 6583 and we can start with the appellant. Or the appellants agent. Good evening, im mike bowling, construction on behalf of patricia calderahead. In my brief i do not want to be redundant and so i have outlined what we would like to say but i would like to respond to their brief, which we received after of course, we filed our brief, page one of their brief

Transcripts For SFGTV 20131221

The appeal be denied and to up hold the permit on the basis that the planning determination on height is accurate and balanced of the issues that were raised are against a cocompliant structure. Thank you. The motion is then to deny the appeal and up hold this permit on the basis of the planning departments determination of it is accurate. And that the structure is code compliant . Yes. Hwang. Aye. Hurtado. Aye. Lazarus. Aye. Honda. Thank you. The vote is 50 and the permit is upheld on that basis. We are going to take a short break, five minutes. Welcome back to the board of appeals and we are on item number 7, appeal 13141. And this is patricia. Calderahead verses the department of building of inspection. 30323034 jackson street. Protesting the issuance on october 18, 2013, to nancy wong, alteration permit response to nov no. 201317501; shoring plan and sequence of excavation up to 20 at perimeter walls; revision to bpa no. 2007 07 12 6583; reference to bpa nos. 2009 09 24 7633, 2011