comparemela.com

Latest Breaking News On - Fund master - Page 1 : comparemela.com

Transcripts For SFGTV Government Access Programming 20240714

Heard a lot today is go 95, and thats 600 pages of state rules for overhead line design, construction, and maintenance. Of course as you heard earlier, this was developed over years of workshops and reviews and collaboration between all of the utilities. So on this slide, im just kind of going over the attachments and what we do. At t is attached to approximately 26,000 poles in San Francisco. Now, of those, 2,000 are solely owned by at t. The majority we are coowners with pg e and you heard a little bit about that earlier. Our inspections as far as maintenance and inspections and protocols, our techs are required to inspect the infrastructure for safety issues every single time they touch our equipment. So if you are running around San Francisco, you see our trucks everywhere. So we are constantly doing these evaluations. They actually call it a tzone inspection that they need to do, where they look up the pole and then they look both directions as far as the ooi can see just to notic

Transcripts For SFGTV Government Access Programming 20240714

Of course as you heard earlier, this was developed over years of workshops and reviews and collaboration between all of the utilities. So on this slide, im just kind of going over the attachments and what we do. At t is attached to approximately 26,000 poles in San Francisco. Now, of those, 2,000 are solely owned by at t. The majority we are coowners with pg e and you heard a little bit about that earlier. Our inspections as far as maintenance and inspections and protocols, our techs are required to inspect the infrastructure for safety issues every single time they touch our equipment. So if you are running around San Francisco, you see our trucks everywhere. So we are constantly doing these evaluations. They actually call it a tzone inspection that they need to do, where they look up the pole and then they look both directions as far as the ooi can see just to notice if there are any irregularities or anything that needs to be repaired and they are empowered to repair that on site or

Transcripts For SFGTV Government Access Programming 20240714

Thats 600 pages of state rules for overhead line design, construction, and maintenance. Of course as you heard earlier, this was developed over years of workshops and reviews and collaboration between all of the utilities. So on this slide, im just kind of going over the attachments and what we do. At t is attached to approximately 26,000 poles in San Francisco. Now, of those, 2,000 are solely owned by at t. The majority we are coowners with pg e and you heard a little bit about that earlier. Our inspections as far as maintenance and inspections and protocols, our techs are required to inspect the infrastructure for safety issues every single time they touch our equipment. So if you are running around San Francisco, you see our trucks everywhere. So we are constantly doing these evaluations. They actually call it a tzone inspection that they need to do, where they look up the pole and then they look both directions as far as the ooi can see just to notice if there are any irregularitie

Transcripts For SFGTV Government Access Programming 20240714

And what we do. At t is attached to approximately 26,000 poles in San Francisco. Now, of those, 2,000 are solely owned by at t. The majority we are coowners with pg e and you heard a little bit about that earlier. Our inspections as far as maintenance and inspections and protocols, our techs are required to inspect the infrastructure for safety issues every single time they touch our equipment. So if you are running around San Francisco, you see our trucks everywhere. So we are constantly doing these evaluations. They actually call it a tzone inspection that they need to do, where they look up the pole and then they look both directions as far as the ooi can see just to notice if there are any irregularities or anything that needs to be repaired and they are empowered to repair that on site or file a report immediately. Go 95 also lays out a timeline that you heard earlier for routine inspections at longer intervals, but we feel here with at t and in San Francisco which is so dense and

Transcripts For SFGTV Government Access Programming 20240714

Ill be using the overhead. Supervisor fewer oh, the overhead, please, mr. Carroll. Ilene bovin coalition for San Francisco neighborhoods here on my own behalf. On the overhead is the proposal for the 2019 Building Code update. It was presented at the Capital Planning committee on july 22 of this year. In its presentation, the department of the environment stated that 35 of the citys emissions today is from privatesector natural gas. To reduce these emissions, the proposal is to encourage all electric design in new construction. The timeline for this proposal is for review by the department of building inspection and Code Advisory Committee in august, the board of supervisors Land Use Committee in september, and the full board in october. While not in the department of the environment presentation, the Capital Planning Committee Members expressed concerns. With increased reliance on electricity, the issue of reliability was raised. The response was possible use of Battery Storage for el

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.