The Brewery Art Center is getting a major facelift. According to Director of Operations Mikey Wiecek, the main building known as the Brewery Building was built in 1864, and recently received a historic preservation grant to restore and repair the exterior walls at a cost of over $300,000.
The Brewery Art Center is getting a major facelift. According to Director of Operations Mikey Wiecek, the main building known as the Brewery Building was built in 1864, and recently received a historic preservation grant to restore and repair the exterior walls at a cost of over $300,000.