Silcotub started a solar project with a nominal power of 19.8 MW, respectively 21.2 MWp in Calarasi, worth almost 97 million lei (VAT included), accordi.
Romanian seamless pipe manufacturer Silcotube said on Monday it has started the construction of a 19.8 MW solar power plant in the south-eastern county of
Industrial pipe manufacturer Silcotub Zalau, part of the international Tenaris group, held by the Italian Roca family, has started construction of a photovoltaic power project, with a nameplate capacity of 19.8 MW and 21.2 MWp, respectively, in Calarasi.
In the conditions of the volatility of the energy market after the start of the war in Ukraine by the Russian Federation two years ago, the company Tenaris Silcotub SA will build a photovoltaic park in Calarasi, with a nominal power of 19.8 Megawatts, which will provide 10% of the energy consumption of the production capacities of the respective company, Mihaela Popescu, the president of the company from our country, announced yesterday, during a press conference.
Industrial pipe manufacturer Silcotub Zalau, part of the international Tenaris group, held by the Italian Roca family, has started construction of a photovoltaic power project, with a nameplate capacity of 19.8 MW and 21.2 MWp, respectively, in Calarasi.