vimarsana.com

Travelers urged to check for travel impacts at Vantage Bridge, along alternate routes

VANTAGE — Work on the Vantage Bridge is expected to lead to delays – maybe long delays – especially on busy summer weekends. As a result the Washington Department of Transportation is suggesting that drivers look for alternative routes on those busy weekends.

The $79 million project will repair the bridge deck, which has shown signs of deterioration. Work is scheduled for spring, summer and fall through 2027. Cost of the project is about $79 million.

Megan Lott, DOT public information officer for the South Central region, said travelers should prepare for longer trips, no matter what route they take.

Related Keywords

Kennewick , Washington , United States , Blewett Pass , Ellensburg , Wenatchee , Ritzville , Megan Lott , Washington Department Of Transportation , Vantage Bridge , Washington Department , South Central , Columbia Basin , Memorial Day , Labor Day , Pioneer Memorial Bridge ,

© 2024 Vimarsana

comparemela.com © 2020. All Rights Reserved.