comparemela.com

Card image cap

MODEC will be responsible for the design of the hull and all related topsides facilities for the FPSO, which is projected to be moored by a SOFEC Spread Mooring system. The produced stabilized crude will be stored in the FPSO tanks, and the oil will be offloaded to shuttle tankers to go to market.

Related Keywords

Brazil , Hirohiko Miyata , Shell , Front End Engineering , Floating Production , Brasil Ltda ,

© 2024 Vimarsana

comparemela.com © 2020. All Rights Reserved.