AmpIn Energy Transition has announced a partnership with Allana Group to supply 4.5 MW of solar power to its plant in Aligarh, Uttar Pradesh. This will increase the usage of renewable energy to around 50% of the total energy mix at the plant. The power will be provided from AmpIn Energy Transition's Mishrikh Solar Project, which has a capacity of 30 MW. Allana Group's Director, Ajay Mittal, stated that this move will bring renewable energy replacement to about 50% of the plant's total energy mix.